Pictures of the trail work done by NEMBA and volunteers on June 19th, 2004.
All Images Are Original Photos Copyright © 2002 - 2008 by FellsBiker.com
Click an image to zoom in...
|
|
Trail narrowing on the right edge
|
Trail narrowing along the right and some rolling grade dips to sheet all the water off the trail
|
One of the lower, smaller dips
|
Rocks ancor the trail in place, while the dip keeps the water off
|
This area was re-bench cut and made nice and narrow (I helped with this part)
|
Same area a little further up
|
Same area looking back
|
Three more Rolling Grade Dips on the other side to keep the trail water-free
|
A lot of the rough roots were also covered up by the the dips
|
:-)
|